DATA SHEET FOR THE DESIGN OF AIR POLLUTION CONTROL SYSTEMS
 Project Description:
   
Project Ref. Number:

 Date:
 

Client Details:
Name:

Tel No.

Fax No.

 
Responsible Persons:
Technical:

Commercial:

 
SITE CONDITIONS
Geographic Location:

Altitude Above Sea Level:
  Meters
 
Ambient Conditions:
                                             Normal                     Minimum                   Maximum
Temperature °C                                                              
Humidity %                                                                      
Wind Speed   mps               
                         
 
PROCESS DESCRIPTION
Description:
 
  
Galvanising             Bath             TO/H               
Sewage Plant         Inlet                    Pump        
Foundry                 Sand                         
Nitric Ox Process   Temp           Cap                  
                                        


INLET CONDITIONS - Flow 1
Design Gas Flow          M3/H                  Actual      Normal  
Actual Fluctuations      Min              
                                  Max             
Gas Temperature °C     Design               Min    Max
Gas Pressure              Design  Units :     Min    Max
                                   At Process          At Inlet To Air Pollution Plant   
 
Gas Composition                            M/M%                 V/V%
                                                      Air                      O2    
                                                      Water                 SO3  
                                                      CO2                   SO4  
                                                      CO                     NOX  
 
Particulate Size Distribution             %W/W               mg/Nm³  
 
                                           Micron                    Micron
                                                   <1                       <20  
                                                   <2                       <50  
                                                   <5                       <100
                                                   <10                     >100
Particulate Composition:
                                         
                                         
                                         
                                         
 
Special Conditions
                            Flammable             Yes           No  
                            Explosive               Yes           No  
                                                          Other
 
Distance From Process Plant
                                           Distance  Meters 
                                           Duct Size mm   
 
OUTLET CONDITIONS - Flow 2
Required Outlet Concentrations
                         Applicable Standard
                                               SA           UK           German
                                               Other
 
Where possible please specify in
                                   PPM                                      mg/Nm³   
                                                
                                                
                                                
                                                
 
Special conditions that apply
                        Temperature        0C
                        Stack Velocity     m/s
                        Relative Humidity %
                        Plume Visibility   
                        Other                  
                        Stack Height        m
 
EFFLUENT SPECIFICATIONS - Flow 3
The final effluent composition will be determined by the choice of effluent treatment chosen for your application. Special requirements or limitations are to be described below:
 
Maximum Salt Content                                                                                                         
              Solid Content                       Maximum 
                                                         Minimum 
              Chemical Concentration        Maximum 
                                                         Minimum  
              Temperature                                         0C
 
Effluent Dumping
              Continuous        Batch     Other  
 
EFFLUENT SPECIFICATIONS - Flow 3
Final reagent requirements will be determined by the choice of effluent treatment chosen for your application. Special requirements or limitations are to be described below:
 
Supply System of Chemicals
              Bulk Storage of Chemical    
              Automatic Dosing               
              Drums/Bags Only               
              Manual Dosing                   
 
Preferences on Chemical Types
              Caustic Soda           Lime    
              Hypochlorite            Other 
 
Special Conditions
                     
 
PLANT OPERATION POLICY
Gas Supply is:             
                       Continuous                 Batch               Duration              
 
Plant Operation is:
                       Daytime Only             Continuous       Weekdays Only    
 
Plant Control Policy
                       Full Automation                Central Computer Operation       
                       Limited Automation          Manual Where Possible            
              
 
PLANT DESIGN & COSTING POLICY
Capital Versus Operating Costs
                        Minimise capital cost even at higher op. cost   
                        Minimise operating cost even higher capital       
 
Project Requirement Specification
                        Full Turnkey Project        Yes            No  
                        Civils Construction          Yes            No
                        Electrical                        Yes            No
                        Instrumentation               Yes            No  
 
Limited Supplies
                        Design                            Yes            No  
                        Main Vessels                  Yes            No
                        Pumps                            Yes            No
                        Centrifugal Fan                Yes            No
                        Ducting                           Yes            No  
                        Piping                             Yes            No  
 
Special Delivery Requirements
           Months            Weeks
 
Site Services Available
               Electricity               V           50 Hz           60 Hz
               Control System       V            AC              DC          
               Air                                 Dry /Wet /Oilfree
               Water - Potable          0C
               Water - Process         0C
 
Quality Description
                 
 
                  Area Available      
                  Height Available    

                 This Form Copyright © Famsystems (Pty) Ltd. 2002          

PLEASE SPECIFY CLEARLY WHICH ALTERNATIVE APPLIES TO PROJECT